NO. 21/2011 Dredging operations in Ashdod Por

NO. 21/2011 Dredging operations in Ashdod Por

NO. 21/2011 Dredging operations in Ashdod Port and Ashdod area Thursday, 09 June 2011 09:39 Subject: Dredging operations in Ashdod Port and Ashdod area. Charts affected: Survey of Israel, charts no. 323 & 23. B.A., chart no. 1591 This is to advise all mariners that the: Suction Hopper dredger trailing "Edit Simi" will be engaged in dredging operations within Ashdod Harbour and Ashdod area. The dredger is scheduled to operate in the Ashdod Harbour pond until mid August 2011 and to move to the area stretched from south, end of breakwater, up to the Blue Marina, in a strip stretch, 500 m. to 800 m., west of the coast. The dredger will eject the sand north of Ashdod Port, up till Palmachim (Latitude 31° 56, 03' N) 100 m, from the coast line. Works are scheduled to finish end of September 2011. All vessels are requested to keep clear from the "Edit Simi".​
 

Alex33

New member
חייב להודות שראיתי כבר זמן מה מחפר נוסף...

גדול יותר מהולמה, שחופר מזה שבועות מספר באיזור בין נמל אשדוד למרינה. יתכן שזה אכן קשור למאמצים ממושכים של הנהלת המרינה להביא את הנהלת הנמל להכיר באחריותם לחלק מה..סחף שמצטבר "באזור" ושלדברי המומחים המצוטטים בדיוני עבר בנושא, כפי שנמסר לי בזמנו על ידי מנהל המרינה, סחף הגורם במידה רבה גם לסתימת פתח המרינה. מה שבטוח, לפחות לגבי החורף שהסתיים ולהתרשמותי עוד לפני שמחפר חדש זה עבד, מעולם לא היה פתח מרינת אשדוד כה פתוח, רחב ועמוק בכול תקופת החורף כפי שקרה בחורף אחרון
, תקופה בה ה"הולמה" נראתה- ונראית גם כיום- עובדת וחופרת, ועל כך מגיעה מילה טובה ליורם והנהלת המרינה, בתיקווה שמעתה זה יהיה נוהל של שיגרה ברמת תחזוקת המרינה ולא אירוע נסיבתי חד פעמי , כי "הולמה" הייתה פנוייה לעבודה ב"נמל הבית" שלה..
 
למעלה